CubeSat Competition Schedule

 | Post date: 2022/01/18 | 

Dear participants 

The time for submitting the conceptual design document for the second round of the scientific and industrial competition for the design and development of a cubic satellite has ended. 

Please send your design document to WhatsApp number: 09016692067

 Thanks
Secretariat of Scientific and Industrial Competition for Design and development of Cube Satellites 🛰️

View: 362 Time(s)   |   Print: 109 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

The first Cubest conference with the presence of the head of Iran Space Agency

 | Post date: 2022/08/23 | 


The first CUBEST conference was held on July 12, 2022 with the presence of the head of the Iranian Space Agency in the Innovation and Prosperity Fund Conference Hall.

In this conference, the top teams of the first round of the competition presented the results, and the participating teams in the conceptual design phase of the second round and the members of the scientific committee of the competition were appreciated.

 

View: 370 Time(s)   |   Print: 100 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

A new satellite construction project with an IOT mission

 | Post date: 2022/08/22 | 

The new satellite construction project with IOT mission was announced by the secretariat of the cubic satellite design and construction competition to the four teams that entered the phase of engineering model construction from the first round of the competition. Each of the four engineering model teams prepared a proposal for this mission and during a meeting held on Wednesday, June 22, 2022 at MCI LAB, they presented their proposal in order to select the most optimal design for this mission.

View: 372 Time(s)   |   Print: 106 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

A meeting to inquire about the construction of an engineering model

 | Post date: 2022/08/22 | 

On Monday, May 26, 1401, a meeting to inquire about engineering model construction and propose a new project to the teams was held in the presence of the supervisor of four engineering model construction teams, the secretary of the competition, and members of the scientific committee at MCI LAB. At the end of this meeting, it was decided that the S-band patch antenna and the panels are considered functional and the antenna pattern test is acceptable in a simulated way. It was also decided that by June 15th, during a meeting with the members of the scientific committee, the secretariat will announce the first schedule of the engineering model test (including the access of the teams to the laboratory and the delivery of ACS) to the teams that have entered the construction phase.

View: 361 Time(s)   |   Print: 97 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Extension of the conceptual design phase of the second round of the competition

 | Post date: 2022/08/22 | 
Dear participants 

👉🏻With the request of most of the teams participating in the second round of the competition to increase the time of the conceptual design phase and after reviewing the issue by the scientific committee of the competition, it was agreed to extend the design phase time until the end of June,21,2022.

✨It should be noted that the scientific committee of the competition has decided to consider encouragement points for the teams that submit their design reports by April 20, 2022.

➡️So, the deadline for submitting the conceptua! design report will be June 21, 2022, and sending the report after April 20, until June 21, will not have any concession for the teams.

Thanks
Secretariat of Scientific and Industrial Competition for Design and Construction of Cube Satellite 🛰

View: 359 Time(s)   |   Print: 102 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Signing a contract to build an engineering model

 | Post date: 2022/04/4 | 


On Sunday, March 13,2022, in a meeting with the presence of the competition secretary, Engineer Soradeghi, and the heads of the four teams that entered the phase of building the cubic satellite engineering model, a contract was signed between the competition secretariat and the top teams.

View: 660 Time(s)   |   Print: 162 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

meeting to present the progress report of the participating teams in the second round of the competition

 | Post date: 2022/03/14 | 

On Thursday, March 10, 2022, a meeting to present the progress report of the participating teams in the second round of the competition with the presence of foreign teams was held online in Skyroom. During the meeting, some teams had a 10-minute presentation in English.

Following issues were introduced by the presenting teams:
- Team's background and their members.
- Executive program.
- Current situation and activities.
- Suggestions and criticisms.

View: 631 Time(s)   |   Print: 159 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Details of the meeting, presentation of the progress report of the teams of the second round of the competition

 | Post date: 2022/03/7 | 
🚀Dear Sir

✅It is reported that at 8:00 AM on Thursday, March 10, 2022, a meeting to present the progress report of the teams with the presence of foreign teams will be held in the Skyroom.

✅In this meeting, each team, depending on their arrival time, will be given a 10-minute presentation in English, or they can play their 10-minute pre-recorded video during the meeting, instead of presenting it in real time.

⚠️All teams must be present at the scheduled time.

* Skyroom Contest Address: https://www.skyroom.online/ch/smashayekhi92/cubest-meetings

Thanks

Secretariat of Scientific and Industrial Competition for Design and development of Cube Satellites 🛰️

View: 636 Time(s)   |   Print: 166 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Details of the meeting, presentation of the progress report of the teams of the second round of the competition

 | Post date: 2022/03/7 | 
🚀Dear Sir

✅It is reported that at 8:00 AM on Thursday, March 10, 2022, a meeting to present the progress report of the teams with the presence of foreign teams will be held in the Skyroom.

✅In this meeting, each team, depending on their arrival time, will be given a 10-minute presentation in English, or they can play their 10-minute pre-recorded video during the meeting, instead of presenting it in real time.

⚠️All teams must be present at the scheduled time.

* Skyroom Contest Address: https://www.skyroom.online/ch/smashayekhi92/cubest-meetings

Thanks

Secretariat of Scientific and Industrial Competition for Design and development of Cube Satellites 🛰️

View: 581 Time(s)   |   Print: 161 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Holding introductory sessions and presenting the progress reports of the teams of the second round of the competition

 | Post date: 2022/02/27 | 
🚀 Greeting

✅ It is reported that from Thursday, March 10th, 2022, introductory sessions and presentation of the teams' progress report will be held in skyroom.

✅ In these sessions, each team will have a 10-minute presentation, and it is essential that presentations be made in English.

➡️ Topics that need to be covered in this presentation include:
- Introducing the group and members
- executive plan
- current situation
-announce suggestions and criticisms

⚠️ Teams can also play their 10-minute pre-recorded video during the meeting instead of presenting it in real time.

Thanks
Secretariat of Scientific and Industrial Competition for Design and development of Cube Satellites 🛰️

View: 644 Time(s)   |   Print: 164 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Template of the first phase design report 2nd CubeSat Design

 | Post date: 2022/02/20 | 

View: 656 Time(s)   |   Print: 167 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Joining the HES Faraand Gostar Research Company (HESCO) to sponsor the competition

 | Post date: 2022/02/20 | 
Greetings

In the second round of the competition, HES Faraand Gostar Research Company (HESCO) became one of the sponsors of the Cube Satellite Design and Construction Challenge.

Thanks to the director of HES Faraand Gostar Research Company (HESCO), we hope to take a big step towards achieving the goals of this scientific competition and the evolution of the space industry with this cooperation.

Secretariat of Scientific and Industrial Competition for Design and Construction of Cube Satellites 🛰️

HESCOServicesReaction Wheel-RW5-PM8Reaction Wheel-RW15-PM9

View: 653 Time(s)   |   Print: 175 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

CubeSat Competition Schedule

 | Post date: 2022/02/3 | 

View: 647 Time(s)   |   Print: 160 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

January 7th Online meeting video

 | Post date: 2022/01/9 | 
For further information about the competition, please download the January 7th Online meeting recorded video from the link below. 

View: 670 Time(s)   |   Print: 175 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Extension deadline

 | Post date: 2021/12/4 | 
We hereby announce that the registration deadline for the competition has been extended until the end of December.

your sincerely
CubeST Competition secretariat

View: 692 Time(s)   |   Print: 173 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

First round appreciation ceremony

 | Post date: 2021/11/25 | 

We invite you to participate in the appreciation ceremony of the top teams of the first round of the competition on Thursday, November 25th, at 2 to 4 pm Iranian time at the following link.

Conference room


sinecrely,
Cubest Competition Secreteriat


View: 706 Time(s)   |   Print: 173 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Mission statement

 | Post date: 2021/10/20 | 

Mission statement of the second round of Iranian Cubesat Competition: 

To provide IoT service, it is intended to design a satellite constellation, comprising 3 to 5 6-U cubesats at LEO along with data transmission terminals, and ground stations network including telemetry reception and telecommand stations. Each terminal should have the opportunity of sending its data (packet of 4 kB) to the constellation at least once in every 12-hour period. The space segment of the constellation should relay  received data to a ground station (located at the participant’s discretion) in less than 12 hours following reception from terminal. The service area for terminal coverage includes the territory of Iran with the maximum possible peripheral area.
 

 Competition criterion: 

Participants will carry out system design (conceptual design) of the space segment and ground segment of a satellite constellation to fulfill the objectives of the mission statement. 
The space segment system design will include determining the orbital parameters of the satellites as well as conceptual design of the satellites’ systems.
The ground segment system design shall include conceptual design of telemetry station, telecommand station(s) and user terminals. User terminals will be designed based on IoT standards.


 Observations: 

  • Participating teams, at their discretion, will determine constellation pattern, orbital parameters, satellites specifications, communication frequencies among users, satellites and grounds stations, and whether or not to incorporate ISL into the system. The satellites’ altitude willl be bound to 500-700 Km.
  • Satellites will be 6-U cubesats with the weight not exceeding 10 kg. Satellites need not to be identical.
  • Incorporating other satellites or ground facilities to fulfill the mission is not allowed.
  • Operational life span of the constellation will be three years.
  • Cost of the constellation design, build up and maintenance will be determined for the course of three years.
  • User terminals will be designed in accordance with IoT standards.


 Participant’s performance assessment: 

Performance of the participants will be assessed based on appropriateness of the design, and criteria such as minimum implementation cost, maximum coverage area and maximum number of covered users.


View: 779 Time(s)   |   Print: 190 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

International 6U Cubesat Design And Development Competition

 | Post date: 2021/07/18 | 
An international 6U cubesat design and development competition will be held soon by Cubest.ir.
Follow the news to get informed about time schedule, awards, rules and other specifications of this attractive competition.
 

View: 790 Time(s)   |   Print: 192 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Satellite Equipments Supply

 | Post date: 2021/06/14 | 
If you are Supplying or demanding Satellite subsystems equipments and parts, please complete the form in the link below.  

View: 760 Time(s)   |   Print: 193 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

Satellite Equipments Supply

 | Post date: 2021/06/14 | 
If you are Supplying or demanding Satellite subsystems equipments and parts, please complete the form in the link below.
click here
 

View: 563 Time(s)   |   Print: 148 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)

© 2024 All Rights Reserved | Iranian Cube-sat Competition